Upgrade of the 1ES qualified SPS of existing equipment’s in order to implement the new protection functions.




Supply and installation of new CEC MRH2000 modules inDoel 1 and Doel 2 following 1E qualification.


Studies, implementation, installation and commissioning of the process control system for the Long Time Operation program that incorporate an additional fallback system on Unit 1 of the Tihange Nuclear Power Plant.




Revamping of level regulation of the steam generators for Tihange 2 (Belgium) in order to supply a scalable system from an analog to digital technology.


Renovation of the ventilation control system of Doel 1 & 2 control room following 1E qualification.





Revamping of the SIP (Process Instrumentation System) control and monitoring on Tihange 1 (NPP).

SIP is linked to the reactor’s thermodynamic values (temperatures, flow rates, pressures, levels,…)


News

  • 26 July 2018
    Did you see us on our stand at the World Nuclear Exhibition in Paris from June 26 to 28, 2018 - http://www.world-nuclear-exhibition.com/fr/Accueil/
  • 13 July 2018
    « Action nettoyage – Wallonie plus propre » in collaboration with SUSA from Mons on July 13th, 2018
All news
Cookies allow us to offer you our services more easily. By using our services, you expressly give us your consent to exploit these cookies